35 kv Vehicle Mounted Mobile Power Substation
Rated capacity | Voltage Ratio | Vector Group | Cooling method | Short circuit impedance |
5000 | 35/6.3,35/10.5,33/11.5 ,33/6.9 | Yd11 | ONAN/ONAF | 0.065 |
6300 | 35/6.3,35/10.5,33/11.5 ,33/6.9 | Yd11 | ONAN/ONAF | 0.065 |
8000 | 35/6.3,35/10.5,33/11.5 ,33/6.9 | Yd11 | ONAN/ONAF | 0.065 |
10000 | 35/6.3,35/10.5,33/11.5 ,33/6.9 | Dy11 | ONAN/ONAF | 0.065 |
25000 | 66/13.8,66/11.5,66/21 | Dyn11 | ONAN/ONAF | 0.075 |
31500 | 110/10.5,110/11.5,110/13.8,110/21 | YNd11 | ONAN/ONAF | 0.105 |
40000 | 110/10.5,110/11.5,110/13.8,110/21 | YNyn0d11 | ONAN/ONAF | 0.105 |
50000 | 110/10.5,110/11.5,110/13.8,110/21 | YNd11 | ONAN/ONAF/ODAF | 0.17 |
63000 | 110/10.5,110/11.5,110/13.8,110/21 | YNd11 | ONAN/ONAF/ODAF |
0.17 |
Q1:What are the core components of a 35kV vehicle mounted mobile substation?
*High voltage unit: 35kV GIS/HGIS switchgear
*Auxiliary systems: intelligent protection control cabinet, fire protection system, temperature control device
*Structural carrier: heavy-duty semi-trailer or modular container group
Q2:What are the typical application scenarios of 35kV mobile substations?
*Urban power grid: load transfer during substation renovation
*Industrial application: Temporary power supply for large-scale petrochemical/metallurgical projects
*Disaster relief: rapid reconstruction of power grid after earthquakes and floods (72 hour emergency response)
*Overseas projects: power infrastructure construction projects in countries along the the Belt and Road
Q3:What are the advantages of 35kV mobile substations compared to fixed substations?
Comparison Dimension: Vehicle mounted Mobile ;Traditional Fixed
Deployment time 3-7 days ;12-24 months
The investment cost is approximately RMB 8-20 million ; RMB 50 million+
The land demand is only 30 × 15m,;and permanent land acquisition is required for the site
The reuse rate can be recycled 5-8 times;fixed and immovable
Q4:What are the special requirements for the transportation and deployment of 35kV mobile substations?
*Highway transportation: Hydraulic axle trucks (total weight ≤ 80 tons) are required
*Shipping standard: Containers comply with ISO 1496 international shipping standards
*Positioning requirements: Foundation bearing capacity ≥ 150kPa, inclination<0.5 °
Q5:How long does it take for a 35kV mobile substation to be transported and put into operation?
*Regular deployment: 3-7 days (including debugging);
*Emergency mode: It can be put into operation within 48 hours at the fastest (pre installed and debugged).
Q6:Function of intelligent monitoring system for 35kV mobile substation
*Real time monitoring: DGA online oil chromatography analysis
*Warning function: Hot spot temperature over limit alarm (accuracy ± 1 ℃)
*Remote access: Supports IEC61850 communication protocol
*Standard SCADA system
WhatsApp:
+86 15853252696(Jack)
+86 135 8926 2999(MARTIN)
Tel:+86-0532-68688801
Fax:+86-0532-87038801