40.5kV high voltage switchgear and its auxiliary equipment of Huaneng Mengcheng Xutuan phase II wind farm project
The project is located in Mengcheng County, Bozhou City, Anhui Province. The project scale is 51MW. The construction period is from June to December 2021. The bid section is divided into 40.5kV high-voltage switchgear and its auxiliary equipment. The name, quantity and technical specifications of the equipment purchased by hengfengyou are as follows: 7 sets of collector line incoming cabinets, 1 set of main transformer incoming cabinet, 1 set of bus equipment cabinet, 1 set of SVG cabinet, 1 set of FC cabinet, 1 set of grounding transformer cabinet 1 set of energy storage device cabinet, 35kV common box enclosed bus, other auxiliary equipment, spare parts, consumables, special tools, technical data, equipment packaging, transportation and positioning, installation guidance, commissioning, trial operation, 2-year warranty and training and other technical services.