What tests are carried out before the transformer leaves the factory

Writer: Hengfeng you electric Time:2023-05-09 views:times

Before the transformer leaves the factory, the transformer manufacturer will conduct certain tests on the quality, function and service life of the transformer. The general transformer test includes two types, factory test and type test. The transformer type laboratory conducts a representative test to verify whether the transformer meets the specified technical conditions. So, what tests will be performed before the transformer leaves the factory?
 
  Transformation ratio, group, direct resistance, no-load, load, capacity, power frequency withstand voltage, inductive withstand voltage, insulation resistance, dielectric loss, partial discharge, impulse voltage, etc. of the test items required for the transformer factory test.
 
Hengfengyou electric transformer
 
What tests are carried out before the transformer leaves the factory
 
   1. Voltage detection
 
  Detect and test the online voltage and offline voltage of the transformer
 
   Transformer voltage detection
 
  2. Grounding resistance
 
   Grounding resistance refers to the resistance generated when current flows from the grounding body into the soil. This is the ground resistance.
 
  3. DC resistance
 
   DC resistance is the resistance that the element exhibits when direct current is applied, that is, the inherent static resistance of the element. For example, when the coil is connected to direct current and alternating current, its resistance is different. When connected to alternating current, in addition to DC resistance, the coil also has reactance, which reflects the synergistic effect of resistance and reactance, which is called impedance.
 
  4. Short-circuit resistance
 
   It is a very important item in the transformer performance index. The deviation between the actual measured value and the specified value when leaving the factory is very strict.
 
   Transformer short-circuit resistance
 
   5. Output resistance
 
   The output resistance test is mainly used to measure the important index of the amplifier's influence on the signal source. The smaller the output resistance, the stronger the output capability of the amplifier.
 
  6. ​​Withstand voltage test
 
   can effectively find the overall defects of the insulation, such as moisture and dirt, through the relationship between the current and the leakage current can find the local defects of the insulation. Since the voltage is divided by the insulation resistance under DC voltage, it is more effective to find terminal insulation defects than AC voltage.
 
What tests are carried out before the transformer leaves the factory
  7. No-load characteristics
 
   No-load characteristic refers to the change curve of the generator stator voltage and rotor current when the load current is zero at the rated speed of the generator.
 
   8. Transformation ratio test
 
   is mainly used to test the transformation ratio of power transformers.
 
  9. Load test
 
   is mainly to ensure that the transformer can still operate normally when the load exceeds the expected load.
 
  10. Heating test
 
   is used to determine the adaptability of the product in storage, transportation and use under high temperature climate conditions. The severity of the test depends on the high temperature and exposure time.

The above are the 7 common common faults of oil-immersed transformers. If there are other problems or you are not sure, you can contact us in time: info@hengfengyou.com



CATEGORIES

Recommended reading

Contact us

WhatsApp:

+86 15853252696(Jack)

+86 158 5326 5269(Alisa)

Tel:+86-532-87936206

Fax:+86-532-87936207

Email: info@hengfengyou.com

Address: No.638,Zhongcheng Road, Chengyang District, Qingdao City,China

Leave a message now - get the latest industry insights, star products, and success stories of hengfengyou electric

Click to replace Click to replace

© 2021 Copyright By Hengfengyou Electric

xml map    |    Site map

whatsapp
(+86) 15853252696
WhatsApp Click Contact