Power distribution equipment of Guiyang municipal solid waste incineration power generation project
The project is located in Mayan village, Maijia Town, Baiyun District, Guiyang City, Guizhou Province. It is invested and constructed by Beijing environment Co., Ltd. with a total investment of 1259.42 million yuan. The daily treatment of domestic waste of the project is 2000 tons (into the furnace), three 750t / d mechanical grate waste incineration production lines are built, and three medium temperature and sub high pressure (6.4Mpa / 450 ℃) natural circulation water pipe waste heat boilers are equipped; The whole plant is equipped with two 30MW condensing steam turbines + two 35mW generator units; Supporting construction of corresponding public auxiliary facilities. The largest single building area is about 40700 square meters.
Hengfengyou electric mainly provides 1600KVA auxiliary dry-type transformer, KYN61-40.5 series medium voltage switchgear suitable for 35kV Power distribution, 6.6kvkyn28-12 series and xgn2-12 series medium voltage switchgear, MNS series low-voltage switchgear, generator excitation cabinet, generator protection cabinet, XL power control cabinet and other power equipment