Writer: Hengfeng you electric Time:2023-04-07 views:times
Level | Insulation State | Explain |
First Stage | Good insulation elasticity, fresh and uniform color | Good insulation |
Second Stage | The insulation is slightly hard, but the hand does not deform on time, does not crack or fall off, and the color is slightly dark | Still usable |
Third Level | The insulation is brittle, the color is dark, there are slight cracks in the hand on time, and the deformation is not too large | If the insulation is unreliable, replace the coil as appropriate |
Fourth Level | The insulation has been carbonized and brittle, and it will fall off or crack when pressed by hand | out of commission |
Interval | Contents of technical maintenance procedures | Explain |
Power on inspection:
1. For the substation with regular personnel on duty, once every day and night
2. The substation without regular personnel on duty shall not be less than once a day, and the inspection of transformer room shall not be less than once every half a year
Unscheduled inspections are carried out in the following cases:
1) When the outdoor temperature changes dramatically
2) Each time the transformer is disconnected under the action of gas relay protection device or differential relay protection device
Inspection period of transformer oil in operation:
1) The transformer with temperature difference heat dissipation filter shall not be less than once every three years
2) No temperature difference cooling filter, once a year
3) After overhaul
|
Carry out the following inspections:
1) Check the thermometer reading
2) Check the shell state of the transformer, whether the transformer leaks oil, whether there is oil in the oil filled bushing, and whether the oil level in the conservator is consistent with the temperature mark
3) Check the condition of insulating sleeve (insulator), oil cooling device, oil collecting device, bus and cable. Whether there is heat at the contact line
4) Check whether the breakdown fuse and signal device are intact
5) Check the condition of the grounding line in the transformer room
|
The branch line voltage is allowed to continuously exceed 5%, or when the load is 25% of the rated load or the rated load time of day and night is less than 6 hours, the branch line voltage is allowed to continuously exceed 10%. Under the condition that the solidification temperature of transformer oil is not lower than - 40 ℃, the natural oil-cooled transformer can operate at full load |
Notes for successors | Precautions for shift handover personnel |
The successor accepts the duty task of the previous shift, and at the end of the shift, hand over the shift to the successor of the next shift according to the instruction chart. After taking over the shift, read all the records on the duty Notepad, accept the equipment, tools, room keys, duty notepad and statements, report to the superior person on duty that he has entered the duty post and report the defects found after taking over the shift | The shift handover person shall introduce the operation and working system of main electrical equipment, the change of power supply system and operating system, the name of electrical equipment stopped operation and transferred to repair and personnel transfer to the successor |
Normal time | In case of accident |
No matter whether the electrical equipment is in standby or working state, the person on duty shall not leave the post without permission before handing it over to the next shift. Under special circumstances, with the permission of the person in charge of the substation, others can leave the duty post when they are on duty.
During operation switching or equipment startup or shutdown, shift handover is prohibited. When the equipment is in fault state, the shift can be handed over as an exception after obtaining the permission of the person in charge of the line and substation
|
It is forbidden to shift when the accident is being eliminated. When an accident occurs, the person on duty shall immediately notify the person in charge of the substation, and before his arrival, independent measures must be taken to restore the normal operation of electrical equipment
In case of no delay (fire, natural disaster and personal accident), the person on duty shall take independent measures to eliminate the accident, but shall immediately report to the superior leadership after the accident
|
WhatsApp:
+86 15853252696(Jack)
+86 135 8926 2999(MARTIN)
Tel:+86-532-87936206
Fax:+86-532-87936207
Email: info@hengfengyou.com
Address: No.638,Zhongcheng Road, Chengyang District, Qingdao City,China